PLANT CONSTRUCTION CONTRACT

发布时间:2024-08-03 21:53:16

  article1-definitions
  "the owner" shall mean .
  "the contractor" shall mean .
  "the plant" shall mean all or any part of the machinery, equipment andmaterials forming the permanent installation as specified in appendix.
  "the site" shall mean all the land where the plant is to be constructed in accordance with this contract.
  "the works" shall mean the works to be done by the contractor under this contract.
  "the contract price" shall mean the total sum payable to the contractor by the owner for the works.
  article2-contractor""s responsibilities
  1. the contractor shall design, engineer, and construct the plant at the site.
  2. the contractor shall provide all equipment, materials, tools, facilities,labour and services necessary for the successful construction of the plant except those items and facilities to be supplied by the owner under article.
  3. the contractor shall perform the works in accordance with the schedule in appendix.
  4. the contractor shall provide the owner""s personnel with training of peration and maintenance of the plant in accordance with appendix.
  5. the contractor shall supply the owner with the spare parts specified in appendix.
  6. the contractor shall supply the owner with the maintenance equipment specified in appendix.
  article3-owner""s responsibilities
  1. the owner shall make available the site and grant the contractor free and uninterrupted access thereto throughout the duration of this contract.
  2. the owner shall provide those items and facilities specified in appendix at the time therein established.
  3. the owner will obtain from the relevant authorities those licenses and permits necessary to construct and operate the plant on the site including work permit for the contractor""s employees.
  4. the owner shall pay the contractor for the works performed the contract price set out in article.
  article4-contract price
  1. within days after the effective date of this contract, the owner shall pay the contractor as full and complete compensation for accomplishing the works and assuming all obligations under this contract the contract price in the amount of .
  2. the contract price is not subject to escalation, and the cost of executing he works shall be the risk of the contractor who shall be deemed to have btained all information and taken into account all circumstances which may affect the cost in agreeing the contract price.
  article5-drawings
  1. the contractor shall submit to the owner for approval and review within he time specified in appendix _____ such drawings as may be required for construction of the plant under this contract. within one month after receiving such drawings the owner shall review and approve or disapprove the drawing.


  2. the contractor shall be responsible for any defects, errors or omissions in the above drawings unless such defects, errors or omissions are caused by inaccurate information furnished in writing to the contractor by the owner.
  3. all drawings and technical documentation delivered by the owner or the contractor to the other party shall be treated as confidential by the receiving party unless agreed otherwise, and shall not be used by that party for purposes other than those connected with this contract
  article6-inspection
  1. the contractor shall perform all inspection and testing of the plant required by law and normal engineering practice.
  2. the owner shall be entitled at all reasonable times and at its own cost to inspect, examine and test the materials and workmanship of the plant under construction. such inspection, examination or testing if made shall not release the contractor from any obligation under the contract.
  3. the completed plant shall be inspected, examined and tested by the owner,and the contractor shall give the owner reasonable notice in writing of the date on which the plant will be ready for testing.
  4. the contractor shall provide such assistance, labour, materials, electricity,fuels, apparatus, stores and instruments as may be required and as maybe reasonably demanded to carry out such tests by the owner properly and efficiently.
  5. when the plant shall have passed the above tests, the owner shall furnish the contractor with a certificate in writing to that effect. no plant shall be delivered until any faults discovered during inspection are satisfactorily rectified.
  article7-inspection
  1. the contractor shall provide at the site to the reasonable satisfaction of the owner all materials, labour, equipment, services and facilities that may be necessary for the proper execution and completion of the works.
  2. without prejudice to the generality of the above, the contractor shall provide, as may be necessary, the following:
  a. construction equipment.
  b. means of transport within the site including temporary roadways.
  c. fencing, lighting and guarding and all other materials and services necessary for the safety and security of persons and property.
  d. temporary stores, offices and other buildings or structures for materials and persons engaged in the words, including persons employed by the owner.
  e. telephones, fire-fighting equipment and first-aid equipment until the whole works have been taken over.
阅读更多合同范文,请访问生活日记网 用日志记录点滴生活!范文频道。
喜欢范文,那就经常来哦

该内容由生活日记网提供.